M-002 Dual Channel Serial Injection with front cut - Analyst with ICC-CE
From LEAP
(Difference between revisions)
(→Overview) |
|||
Line 8: | Line 8: | ||
=== Overview === | === Overview === | ||
- | This configuration allows the regeneration of one of the analytical columns while the other one is engaged - giving greater efficiency and higher throughput. This can be run directly from within '''Analyst''' using a custom Cycle (requires ICC-CE). With the addition of a selector valve, the solvent | + | This configuration allows the regeneration of one of the analytical columns while the other one is engaged - giving greater efficiency and higher throughput. This can be run directly from within '''Analyst''' using a custom Cycle (requires ICC-CE). With the addition of a selector valve, the solvent front can be cut to waste. |
There are 2 pumps needed, one for the gradient run and another (higher flow rate and isocratic) for regeneration. This configuration requires a 6 port valve for sample loading and a 10 port valve for column switching.<br> Both valves must be controlled by the custom cycle. LEAP can not control the MS Selector valve as part of the cycle. | There are 2 pumps needed, one for the gradient run and another (higher flow rate and isocratic) for regeneration. This configuration requires a 6 port valve for sample loading and a 10 port valve for column switching.<br> Both valves must be controlled by the custom cycle. LEAP can not control the MS Selector valve as part of the cycle. |
Revision as of 21:29, 20 February 2009
Overview
This configuration allows the regeneration of one of the analytical columns while the other one is engaged - giving greater efficiency and higher throughput. This can be run directly from within Analyst using a custom Cycle (requires ICC-CE). With the addition of a selector valve, the solvent front can be cut to waste.
There are 2 pumps needed, one for the gradient run and another (higher flow rate and isocratic) for regeneration. This configuration requires a 6 port valve for sample loading and a 10 port valve for column switching.
Both valves must be controlled by the custom cycle. LEAP can not control the MS Selector valve as part of the cycle.